Club Documents

Name Description Download File Size
Name Description Download File Size
This RPAS WILCO Site Survey may be used for reference by any member flying at Humber Valley's main field at Thackeray Park until October 31, 2024. On or after October 31st an updated site survey will be required. If not posted here in the library, it is the member's responsibility to obtain their own survey before flying. See the MAAC NOTAM 2023-04, MAAC Site Survey Options document for rules about sharing surveys and the update required. Download 9.5 MB
These updated rules apply to all members and allows us to fly sub 250g airplanes and drones at our main field. Please familiarize yourself with these rules before flying. Download 1 MB
These rules apply to indoor flying at York University. Download 203.5 KB
These rules now apply to members flying RPAS between 250g and 25Kg and are tied to the Site Operations Certificate issued to us by MAAC on Nov 4, 2023. Download 1.5 MB
Humber Valley R.C. Flyers Pilot Training Handbook Revision 4.0 - June 2017 Download 669 KB
Humber Valley RC Flyers - Come Fly With Us Download 98 KB

Humber Valley Radio Control Flyers Club History

Download 1.3 MB
Club Constitution
Club Constitution Updated May 5, 2024. Download 102.4 KB
This is a pdf file of 6 airplane ID labels that you can print and write in manually with your name, MAAC#, and phone number to mount on your airplane as required by MAAC policy. Download 84.9 KB
This is a WORD document that you can edit with your name, MAAC #, and phone number to make printed ID labels for your aircraft. Download 90.5 KB
Summer use permit issued by the City of Toronto, Parks and Recreation for the Thackeray Park field from Mar 15/24 to Nov 14/24. Download 667.9 KB
Winter field use permit issued by the City of Toronto, Parks and Recreation for the Thackeray Park Field from Nov 15, 2023 to March 14, 2024. Download 4.9 MB
2023-04 MAAC Site Survey Relief Options
This document issued by MAAC, explains how a common site survey may be shared among members who are flying at Humber Valley's main field and also provides the dates that surveys must be updated (every 56 days). Download 223.5 KB